The Severn Tunnel
Its Construction and Difficulties, 1872 1887
After completion, the Severn Tunnel remained the longest rail tunnel in Britain for over a century. Reissued here is the 1890 second edition of contractor Thomas Walker's first-hand account of the problematic construction of this Victorian engineering triumph. Walker admits that building 'one sub-aqueous tunnel is quite enough for a lifetime'.
CHF 48.90
Preise inkl. MwSt. und Versandkosten (Portofrei ab CHF 40.00)
V103:
Folgt in ca. 5 Arbeitstagen
Produktdetails
- ISBN: 978-1-108-06340-1
- EAN: 9781108063401
- Produktnummer: 14984434
- Verlag: Cambridge University Press
- Sprache: Englisch
- Erscheinungsjahr: 2013
- Seitenangabe: 290 S.
- Masse: H24.4 cm x B17.0 cm x D1.5 cm 505 g
- Abbildungen: Paperback
- Gewicht: 505
1 weiteres Werk von Thomas A. Walker:
Bewertungen
Anmelden