A. Bauer
Shop Floor Control Systems
From design to implementation
Buch
In recent years there has been a tremendous upsurge of interest in manufac turing systems design and analysis. Large industrial companies have realized that their manufacturing facilities can be a source of tremendous opportunity if managed well or a huge corporate liability if managed poorly. In particular industrial managers have realized the potential of well designed and installed production planning and control systems. Manufacturing, in an environment of short product life cycles and increasing product diversity, looks to tech niques such as manufacturing resource planning, Just In Time (lIT) and total quality control among others to…
Mehr
Beschreibung
In recent years there has been a tremendous upsurge of interest in manufac turing systems design and analysis. Large industrial companies have realized that their manufacturing facilities can be a source of tremendous opportunity if managed well or a huge corporate liability if managed poorly. In particular industrial managers have realized the potential of well designed and installed production planning and control systems. Manufacturing, in an environment of short product life cycles and increasing product diversity, looks to tech niques such as manufacturing resource planning, Just In Time (lIT) and total quality control among others to meet the challenge. Customers are demanding high quality products and very fast turn around on orders. Manufacturing personnel are aware of the lead time from receipt of order to delivery of completed orders at the customer's premises. It is clear that this production lead time is, for the majority of manufacturing firms, greatly in excess of the actual processing or manufacturing time. There are many reasons for this, among them poor coordination between the sales and manufacturing function. Some are within the control of the manufacturing function. Others are not.
CHF 150.00
Preise inkl. MwSt. und Versandkosten (Portofrei ab CHF 40.00)
V103:
Folgt in ca. 5 Arbeitstagen
Produktdetails
Weitere Autoren: Bowden, R. / Browne, J. / Duggan, J.
- ISBN: 978-0-412-58150-2
- EAN: 9780412581502
- Produktnummer: 1407026
- Verlag: Springer Netherlands
- Sprache: Englisch
- Erscheinungsjahr: 1993
- Seitenangabe: 368 S.
- Masse: H23.5 cm x B15.5 cm x D1.9 cm 557 g
- Auflage: Softcover reprint of the original 1st ed. 1994
- Abbildungen: Paperback
- Gewicht: 557
47 weitere Werke von A. Bauer:
From design to implementation
Audio Download
CHF 7.75
From design to implementation
Ebook (PDF Format)
CHF 43.82
From design to implementation
Audio Download
CHF 6.50
Bewertungen
0 von 0 Bewertungen
Anmelden
Keine Bewertungen gefunden. Seien Sie der Erste und teilen Sie Ihre Erkenntnisse mit anderen.