Produktbild
Paul E Harris

Planning and Control Using Oracle Primavera P6 Versions 8 to 21 PPM Professional

Buch

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and Layouts, User Preferences and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul… Mehr

CHF 134.00

Preise inkl. MwSt. und Versandkosten (Portofrei ab CHF 40.00)

Versandfertig innerhalb 1-3 Werktagen

Produktdetails


  • ISBN: 978-1-925185-82-9
  • EAN: 9781925185829
  • Produktnummer: 38443042
  • Verlag: Eastwood Harris Pty Ltd
  • Sprache: Englisch
  • Erscheinungsjahr: 2022
  • Seitenangabe: 482 S.
  • Masse: H28.0 cm x B21.6 cm x D2.5 cm 1'201 g
  • Abbildungen: Paperback
  • Gewicht: 1201

Über den Autor


Paul E Harris has worked in the project controls industry for a number of years and has assisted many companies in a range of industries to set up and run project controls systems with a strong focus on project scheduling software. He is the author of dozens of books on project management software including books on Oracle Primavera, Microsoft Project and Elecosoft (Asta) Powerproject. His Melbourne, Australia based company, Eastwood Harris Pty Ltd, offers project controls consulting and training services worldwide based on the books he has written and published. Paul Harris holds an Honours Degree in Civil Engineering obtained in the UK and is a Certified Cost Engineer through AACEI International, a PRINCE2 Registered Practitioner and a Managing Successful Programmes Registered Practitioner.

27 weitere Werke von Paul E Harris:


Bewertungen


0 von 0 Bewertungen

Geben Sie eine Bewertung ab!

Teilen Sie Ihre Erfahrungen mit dem Produkt mit anderen Kunden.