Produktbild
Amit Prakash Patil

Optimization of project network under constrained resource environment

In Construction Industry

Buch

In construction project management, decisions are made based on schedules those are developed during the early planning stage of projects. But sometimes the assumptions made at the planning stage of a project could change during actual construction process. Resources play very important role in the project life cycle. Unavailability or shortage of resources may severely affect the project, leading to increased costs and delayed schedules. Due to these unforeseen changes, decision makers have to make quick decisions for resource allocation under such conditions. Attempt should be made to use technological advances to face the challenges in con… Mehr

CHF 52.90

Preise inkl. MwSt. und Versandkosten (Portofrei ab CHF 40.00)

Versandfertig innerhalb 1-3 Werktagen

Produktdetails


Weitere Autoren: Jadhav, Ravi / Bhanuse, Mahesh
  • ISBN: 978-620-2-55234-9
  • EAN: 9786202552349
  • Produktnummer: 37232529
  • Verlag: LAP Lambert Academic Publishing
  • Sprache: Englisch
  • Erscheinungsjahr: 2020
  • Seitenangabe: 60 S.
  • Masse: H22.0 cm x B15.0 cm x D0.4 cm 107 g
  • Abbildungen: Paperback
  • Gewicht: 107

Über den Autor


Authors are currently working in the department of civil engineering, Annasaheb Dange College of Engineering and Technology Ashta, Sangli, India. Their area of interest is in the field of construction technology and management.

Bewertungen


0 von 0 Bewertungen

Geben Sie eine Bewertung ab!

Teilen Sie Ihre Erfahrungen mit dem Produkt mit anderen Kunden.