Produktbild
Paul E Harris

99 Tricks and Traps for Oracle Primavera P6 PPM Professional Updated for Version 21

The Casual User's Survival Guide Updated for Version 21

Buch

This book quickly gets down to the issues that many people grapple with when trying to use some of the more advanced features of the software and enlightens readers on the traps that some users fall into and how to avoid them. It demonstrates how the software ticks and explains some tricks that may be used to become more productive with the software.Suitable for people who understand the basics of P6 but want a short guide to give them insight into the less intuitive features of the software. It is packed with screen shots, constructive tips and is written in plain English. The book is based on the P6 Version 18 but may be used with earlier v… Mehr

CHF 59.50

Preise inkl. MwSt. und Versandkosten (Portofrei ab CHF 40.00)

Versandfertig innerhalb 1-3 Werktagen

Produktdetails


  • ISBN: 978-1-925185-90-4
  • EAN: 9781925185904
  • Produktnummer: 39081630
  • Verlag: Eastwood Harris Pty Ltd
  • Sprache: Englisch
  • Erscheinungsjahr: 2022
  • Seitenangabe: 292 S.
  • Masse: H13.9 cm x B21.5 cm x D2.1 cm 374 g
  • Abbildungen: 265
  • Gewicht: 374
  • Sonstiges: General (US: Trade)

Über den Autor


Paul E Harris has worked in the project controls industry for a number of years and has assisted many companies in a range of industries to set up and run project controls systems with a strong focus on project scheduling software. He is the author of dozens of books on project management software including books on Oracle Primavera, Microsoft Project and Elecosoft (Asta) Powerproject. His Melbourne, Australia based company, Eastwood Harris Pty Ltd, offers project controls consulting and training services worldwide based on the books he has written and published. Paul Harris holds an Honours Degree in Civil Engineering obtained in the UK and is a Certified Cost Engineer through AACEI International, a PRINCE2 Registered Practitioner and a Managing Successful Programmes Registered Practitioner.

27 weitere Werke von Paul E Harris:


Bewertungen


0 von 0 Bewertungen

Geben Sie eine Bewertung ab!

Teilen Sie Ihre Erfahrungen mit dem Produkt mit anderen Kunden.